ISO CG 22 94 Subcontractor Work & Action-Over Exclusion Audit
Surplus-lines and low-cost construction GL binders frequently attach three coverage-destroying endorsements: (1) ISO CG 22 94 or CG 22 95, which deletes the critical "Subcontractor Exception" to the "Your Work" exclusion (meaning if a subcontractor you hired causes a $400,000 water or structural defect, your GL policy pays $0); (2) ISO CG 21 39 (Contractual Liability Limitation), which deletes coverage for indemnity obligations in your construction contracts; and (3) an "Action-Over / Employee of Independent Contractor" exclusion.
General Contractor Left With $320,000 Uninsured Water Defect Claim Due to Missing CG 20 37 & CG 22 94 Exclusion
A GC collected a subcontractor COI showing "Additional Insured: Yes," but the actual binder only attached ISO CG 20 10 (Ongoing Operations)—omitting ISO CG 20 37 (Completed Operations)—and the GC’s own GL policy contained ISO CG 22 94 deleting the Subcontractor Exception.
EndorseIQ™ mandates both ISO CG 20 10/20 38 and CG 20 37 (Completed Operations), strikes ISO CG 22 94 and CG 21 39, and enforces Primary & Non-Contributory (CG 20 01) vertical exhaustion.
Check Your Full Contract PDF for Cross-Section Overrides (Free 60s Scan)
Fixing one clause alone often fails when a buried definition, exhibit, or survival clause elsewhere in your Construction GL & Subcontractor neutralizes your protection. Drop your PDF or Word (.docx) below for an instant, 100% anonymous cross-section audit.
“REMOVAL OF CG 22 94, CG 21 39 & ACTION-OVER EXCLUSIONS: (a) ISO Endorsements CG 22 94, CG 22 95, and CG 21 39 are strictly prohibited and deleted in their entirety, preserving full ISO CG 00 01 "Subcontractor Exception" to the
What to Say to the GL Carrier & Upstream GC / Owner Requirements
"As a contractor utilizing trade subcontractors and signing standard AIA indemnity agreements, we cannot bind a GL policy containing ISO CG 22 94, CG 21 39, or an Action-Over exclusion. Please quote on unmodified ISO CG 00 01 occurrence wording."
Why they drafted it this way: E&S carriers slash GL premiums by 15% by attaching CG 22 94 and Action-Over exclusions—knowing that for a General Contractor who subcontracts 80% of the trade work, CG 22 94 effectively guts the entire Completed Operations policy.
Mandatory Audit Checklist Points
- Strike ISO CG 22 94 and CG 22 95 so the Subcontractor Exception to "Your Work" remains intact
- Strike ISO CG 21 39 (Contractual Liability Limitation) so AIA/MSA "Insured Contracts" are covered
- Reject any Action-Over / Employee of Subcontractor / NY Labor Law § 240/241 bodily injury exclusion
- Remove Tract Housing, Multi-Family, Mixed-Use, or Earth Movement/Subsidence manuscript exclusions
Paste Your ISO CG 22 94 subcontractor work exclusion Action Over CG 21 39 Section or Upload Your Full Construction GL & Subcontractor (.pdf / .docx)
Check if your draft has a hidden loophole or cross-section override. Click ⚡ Preview Sample Audit (Instant) to see a live demo in 0.2s, or upload your own PDF / Word (.docx) contract below:
EndorseIQ™ Policy & Binder Scanner
ACTIVE ENGINE: ENDORSEIQ™ (MULTI-HOP ISO & COVERAGE GRAPH)Frequently Asked Questions
Why is ISO CG 22 94 fatal for a General Contractor or Custom Home Builder?
In a standard unendorsed ISO CG 00 01 policy, Exclusion l. ("Damage to Your Work") contains a vital exception: it does NOT exclude work performed on your behalf by a subcontractor. ISO CG 22 94 deletes that exception—meaning if your plumbing or roofing sub’s defective work ruins the building after completion, your GL carrier denies the entire claim.
How do I redline ISO CG 22 94 subcontractor work exclusion Action Over CG 21 39 traps in my Construction GL & Subcontractor anonymously without creating an account?
Upload your Construction GL & Subcontractor PDF or Word (.docx) draft to ExclusionRadar.com to run the "ISO CG 22 94 Subcontractor Work & Action-Over Exclusion Audit" defense cartridge 100% anonymously—with zero account registration, zero email login, and stateless in-memory processing. EndorseIQ™ flags ISO CG 22 94 subcontractor work exclusion Action Over CG 21 39 exposure (typically $150,000 – $1,000,000+ in uninsured construction defect or injured worker claims; documented unredlined loss: $320,000 denied Completed Operations & subcontractor defect claim), checks for cross-section overrides, and exports a ready-to-send Microsoft Word (.docx) Track-Changes file.
More Construction GL & Subcontractor Redline Playbooks
View All Construction GL & Subcontractor PlaybooksISO CG 20 01 Primary & Non-Contributory + CG 24 04 Subrogation
Even when a contractor or vendor has a $1M GL policy and a $5M Umbrella policy, a missing ISO CG 20 01 (Primary and Non-Contributory) endorsement or an Umbrella "Other Insurance" clause can trigger "Horizontal Exhaustion"—allowing the subcontractor’s Umbrella carrier to refuse to pay until the upstream Owner’s and GC’s own primary policies are exhausted first. Similarly, an ISO CG 24 04 Waiver of Subrogation that requires a scheduled list instead of blanket wording leaves you open to carrier subrogation suits.
Construction Subcontractor Agreement Redline Auditor (Pay-if-Paid & Retainage)
General Contractor (GC) subcontracts are notoriously one-sided. A "Pay-if-Paid" clause means if the property owner gets into a dispute with the GC over something completely unrelated to your trade, the GC never has to pay you for your completed work and materials.
NDA & Confidentiality Agreement Redline Auditor (Residuals & Hidden Non-Solicits)
Enterprise counterparties regularly sneak a "Residuals Clause" into standard NDAs stating that anything their employees "retain in their unaided memory" after reading your pitch deck or source code can be freely used to build a competing product.
1099 Independent Contractor Agreement Redline Auditor
Many companies hand 1099 independent contractors a repurposed W-2 employee agreement that demands full-time exclusivity, claims ownership of everything you build on nights and weekends, and forces you to indemnify the company against their own business mistakes.